Hydropower Projects

mai khola

Upper Chaku A Hydropower Project

Marbin,Fulpingkatti (Sindhupalchok)

Chaku Khola lies in the frontier of Phulpingkatti VDC and Marming VDC. The Project area lies along the middle reach of Chaku Khola of Sindhupalchowk district of Bagmati zone in the Central Development Region of Nepal. Geographically, the project area is located in between the longitudes 85º58’06”E and latitude 27º51’32”N (at Headworks site) and 85º55’47”E and 27º 52’31”N (at Powerhouse site). Physiographically, the project area belongs to the middle mountains and lies in between 1300m to 2200m above mean sea level.
  • Issue Date: 2012-02-24
  • Installed Capacity : 22.2MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Likhu-4 Hydropower Project

Ragani,Pokli (Okhaldhunga) Saibu,Bijulikot,Naga Daha,Tilpung (Ramechhap)

  • Issue Date: 2012-03-11
  • Installed Capacity : 52.4MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Lower Khare Hydropower Project

Bulung,Chankhu,Khare,Suriti (Dolakha)

The project has an installed capacity of 11 MW at Q40 with design discharge of 10.1 m3/s and gross head of 140.5m.The project is located at Suri, Chankhu and Khare VDCs of Dolakha District which is about 175 km east from Kathmandu. The Generation license has been received from Department of Electricity Development of under Ministry of Energy for 11 MW Capacity. The Power Purchase Agreement (PPA) with Nepal Electricity Authority (NEA) has been conducted for 11 MW has also been signed. The Initial Environmental Examination (IEE) and Supplementary IEE for 11 MW have been approved by Government of Nepal.
  • Issue Date: 2012-07-03
  • Installed Capacity : 11MW
  • Phase : Under Construction
mai khola

Midim Khola Micro Hydro Project

Isaneshwor (Lamjung)

  • Issue Date: 2012-07-29
  • Installed Capacity : 0.1MW
  • Phase : Under Construction
mai khola

Upper Sanjen Hydropower Project

Chilime (Rasuwa)

The upper scheme, Sanjen (Upper) Hydroelectric Project (SUHEP), will have an installed capacity of 14.8 MW at a gross head of 161 m and annual energy generation of 82 GWh. The design discharge of the project is 11 m3/sec.
  • Commercial Operation Date : 2011-12-05
  • Installed Capacity : 14.8MW
  • Phase : Under Construction
  • Type : Peaking Run-of-River
mai khola

Kabeli-A Hydropower Project

Ambarpur,Panchami (Panchthar) Thechambu (Taplejung)

Kabeli-A Hydroelectric Project (KAHEP) is located in Panchthar and Taplejung districts of Province 1. The project is Peaking Run-Of-River (PROR) type project with a peaking reservoir constructed by damming Kabeli River at headworks. The water from the reservoir will be diverted through a 4.5 km long tunnel into a Powerhouse located on the left bank of Tamor River generating 37.6 MW. The generated power will be evacuated through 132kV Kabeli Corridor Transmission line from the switchyard located at Powerhouse site of the project. In the equity part of total capitalized cost of the project, majority of equity is held by Butwal Power Company Ltd. BPC owns 55.6% equity shares in Kabeli Energy Limited (KEL) with 26% direct holding and the remaining through Gurans Energy Limited, a JV investment company. In the debt part US$ 78.6 million will be available from WB and IFC. Loan Agreement between GoN and WB was signed and US$ 40 million loan available from WB is being channelized to Kabeli-A project through Hydropower Investment and Development Company Ltd (HIDCL). US$ 38.6 million of loan will be provided by International Finance Corporation (IFC). 24 km of access road to the project sites have been constructed and upgraded by the project. Access tunnel excavation work has been completed and main tunnel excavation has been started from headworks site and completed for around 1000 m. Temporary Contractor camps and facilities at headworks and power house sites have been also been completed. Due to the lack of progress and non-compliances issues of the Contractor, the contract has been terminated and project construction activities at site are on hold now. Recovery plan has been formulated and is being implemented.
  • Issue Date: 2012-09-06
  • Installed Capacity : 37.6MW
  • Phase : Under Construction
  • Type : Run Of River
mai khola

Rasuwagadhi Hydropower Project

Thuman,Timure (Rasuwa)

Rasuwagadhi Hydroelectric Project (RGHEP) having capacity of 111MW in Rasuwa district of Central Development Region. The cost of the project is estimated to be NRs. 13,684.20 million excluding financial cost. A 50:50 debt-equity structure will be employed for financing this project.
  • Commercial Operation Date : 2020-02-19
  • Installed Capacity : 111MW
  • Phase : Under Construction
  • Type : Run-of-River
mai khola

Upper Khimti Hydropower Project

Chuchure (Ramechhap)

  • Issue Date: 2012-12-18
  • Installed Capacity : 12MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Namarjun Madi Hydropower Project

Namarjung,Sildujure (Kaski)

  • Issue Date: 2012-12-26
  • Installed Capacity : 12MW
  • Phase : Live
mai khola

Upper Mailun Khola Hydropower Project

,Gatlang,Haku,Dandagoun (Rasuwa)

  • Issue Date: 2013-04-01
  • Installed Capacity : 14.3MW
  • Phase : Under Construction
mai khola

Junbeshi Hydropower Project

Beni (Solukhumbu)

  • Issue Date: 2013-01-04
  • Installed Capacity : 5.2MW
  • Phase : Under Construction
mai khola

Dordi-1 Hydropower Project

Chiti,Bansar,Dhodeni,Faleni (Lamjung)

The project is located in Dordi Gaupalika-6, Lamjung. Its registered office is located at Kathmandu -11, Bluestar Complex, Tripureshor.
  • Issue Date: 2013-01-25
  • Installed Capacity : 12MW
  • Phase : Under Construction