mai khola

Salubyani Gad Small Hydropower Project

Kalukheti, Bajhang

  • Issue Date: 2018-09-20
  • Installed Capacity : 0.233MW
  • Phase : Application for Generation License
mai khola

Bajra Madi Hydropower Project

Kalika, Kaski

  • Issue Date: 2018-09-20
  • Installed Capacity : 24.8MW
  • Phase : Under Construction
  • Type : Run-0f-River
mai khola

Tadi Khola Cascade Hydropower Project

Samundratar, Nuwakot

  • Application Date: 2018-06-13
  • Installed Capacity : 3MW
  • Phase : Under Construction
  • Type : Run-of-River, Cascade
mai khola

Likhu Khola Hydropower Project

Rawadolu,Khijichandeshwari (Okhaldhunga) Pritee,Kubukasthali (Ramechhap) Goli (Solukhumbu)

Likhu Khola Hydropower Project is a run-of-the-river type scheme located at Rawadolu, Kubu Kasthali, Khiji Kati, Khiji Chandeswori and Preeti VDCs of Okhaldhunga & Ramechhap district of Sagarmatha and Janakpur zones of Central Region of Nepal. The headworks site is located 250m downstream of the confluence of Likhu river and Sapsu khola. The powerhouse is located immediately downstream of the suspension bridge over Likhu Khola at Tosipa village. The approximate distances of powerhouse and headworks of proposed project from Bhandara Bazaar, the nearest Bazaar from the project area, 8 and 12 km respectively.
  • Issue Date: 2018-09-20
  • Installed Capacity : 30MW
  • Phase : Under Construction
  • Type : Run of River
mai khola

Nyadi- Phidi Hydropower Project

Bahundada, Lamjung

  • Issue Date: 2018-09-20
  • Installed Capacity : 24MW
  • Phase : Under Construction
mai khola

Kaligandaki Gorge Hydropower Project

Narchyang,Dana (Myagdi)

  • Issue Date: 2018-09-20
  • Installed Capacity : 164MW
  • Phase : Under Construction
mai khola

Theule Khola Hydropower Project

Baglung

  • Commercial Operation Date : 2018-07-08
  • Installed Capacity : 1.5MW
  • Phase : Live
mai khola

Kulekhani 3 Hydropower Project

Bhaise (Makawanpur)

  • Issue Date: 2008-03-30
  • Installed Capacity : 14MW
  • Phase : Under Construction
mai khola

Giri Khola Hydropower Project

Haku (Jumla)

  • Installed Capacity : 0.214MW
  • Phase : Under Construction
mai khola

Salleri Chialsa Small Hydropower Project

Haku (Jumla)

  • Issue Date: 2010-07-01
  • Installed Capacity : 0.6MW
  • Phase : Under Construction
mai khola

Upper Khadam Small Hydropower Project

Patigaun (Morang)

  • Issue Date: 2010-09-04
  • Installed Capacity : 0.99MW
  • Phase : Under Construction
mai khola

Lower Modi Khola Hydropower Project

Durlung,Deurali,Ramja,Tilahar (Parbat)

MEL is developing 20 MW Lower Modi Khola Hydroelectric Project, located in Parbat District. The annual generation of energy is 117 GWh. The project is under construction.The Lower Modi Hydroelectric Project (LMHEP) is located in Deopur, Bajung, Tilahar,Durlung and Chuwa Village Development Committee of Parbat District in the Western Development Region of Nepal.
  • Issue Date: 2010-09-06
  • Installed Capacity : 20MW
  • Phase : Under Construction