https://fkm.ac.id/ https://shm.ac.id/ Togel Lotto Rtp meraktoto slot gacor slot gacor 2025 meraktoto meraktoto meraktoto meraktoto Slot Gacor Terpercaya Lucky Neko wisatajatim.co.id sportnewsindonesia.com MERAKTOTO MERAKTOTO MERAKTOTO slot online slot gacor maxwin slot dana 10k MERAKTOTO MERAKTOTO MERAKTOTO LOGIN Situs Toto Slot
Trishuli River

10

Projects

Hydropower Projects on
Trishuli River

100MW

Installed capacity

Super Trishuli Hydropower Project

Trishuli River
Darechauk (Chitawan) Jogimara (Dhading) Makaising,Tanglichok,Bhumlichok,Ghyalchok,Taklung,Manakamana (Gorkha)
Issue Date: 2018-01-21
Installed Capacity : 100 MW
Phase : Under Construction
View On Map

24MW

Installed capacity

Trishuli Hydropower Station

Trishuli River
Trishuli, Nuwakot
Commercial Operation Date : 1967-04-14
Installed Capacity : 24 MW
Phase : Live
View On Map

102.0MW

Installed capacity

Upper Trishuli-2 Hydropower Project

Trishuli River
Haku, Rasuwa
Issue Date: 2018-09-20
Installed Capacity : 102.0 MW
Phase : Under Construction
View On Map

4.3MW

Installed capacity

Upper Trishuli Khola HPP

Trishuli River
Dhunche,Syafru (Rasuwa)
Issue Date: 2019-01-07
Installed Capacity : 4.3 MW
Phase : Survey License Approved
View On Map

60MW

Installed capacity

Upper Trishuli 3A Hydropower Project

Trishuli River
Dandagoun,Laharepouwa,Thulogoun,Ramche (Rasuwa)
Issue Date: 2011-02-27
Installed Capacity : 60 MW
Phase : Live
View On Map

65MW

Installed capacity

Middle Trishuli Ganga Nadi Hydropower Project

Trishuli River
Gerkhu, Nuwakot
Issue Date: 2018-09-20
Installed Capacity : 65 MW
Phase : Application for Generation License
View On Map

75MW

Installed capacity

Trishuli Galchhi Hydropower Project

Trishuli River
Duipipal,Ratmate (Nuwakot)
Issue Date: 2016-10-17
Installed Capacity : 75 MW
Phase : Issued Generation License
View On Map

216MW

Installed capacity

Upper Trishuli-1 Hydropower Project

Trishuli River
Dhunche,Haku (Rasuwa)
Issue Date: 2017-11-09
Installed Capacity : 216 MW
Phase : Under Construction
View On Map

37MW

Installed capacity

Upper Trishuli 3B Hydropower Project

Trishuli River
Manakamana (Nuwakot)
Commercial Operation Date : 2018-11-01
Installed Capacity : 37 MW
Phase : Under Construction
View On Map

14.1MW

Installed capacity

Devighat Hydropower Station

Trishuli River
Battar, Nuwakot
Commercial Operation Date : 1984-12-01
Installed Capacity : 14.1 MW
Phase : Live
View On Map